Underfloor Heating Install in an old chapel
Date: 24 April 2026
We were asked to install a full underfloor heating system throughout an old chapel. This involved excavating the existing flooring, laying 150mm of insulation followed by an additional 100mm layer, and installing the heating pipework before applying a 60mm thermal liquid screed. To complete the system, we fitted a Mitsubishi Eco-Dan air source heat pump along with a hot water cylinder, providing efficient heating and hot water for the entire property.